Medium Voltage Transition Cable Splices

Medium voltage transition cable splices play a key role in ageing distribution networks where different cable generations must operate together. They are used to connect legacy and modern cable systems reliably, often as part of phased network renewal and upgrade programmes. The performance of these transition points has a direct impact on long‑term network reliability.

This page provides a practical, technically accessible guide to transition cable splices in medium voltage networks. It focuses on risk recognition, failure mechanisms and proven approaches that support long‑term grid reliability for DNOs.

MV transition splices that connect legacy and modern cable systems reliably

Most medium-voltage networks have been built and expanded over decades. That history is still visible underground today: different cable generations, technologies and standards coexist within a single distribution network. For Distribution Network Operators (DNOs), this is the daily reality.

Despite the widespread rollout of modern cable systems, a significant installed base of older cable types still exists across Europe. This results in aging PILC challenges. In many medium-voltage networks, paper-insulated lead-covered (PILC) cables remain in operation, often after decades of service. Research shows that these legacy assets are still commonly found in active distribution networks, highlighting the scale of ageing infrastructure that utilities must manage (MDPI study on PILC cables).

When renewal, reinforcement or expansion projects are carried out, new cable sections must be integrated into existing routes. In practice, this often means connecting older cable types—such as PILC or early-generation polymer cables—to modern XLPE systems.

As a result, distribution networks increasingly contain transition points between different cable technologies. These interfaces are not exceptions, but a structural part of today’s network landscape, reflecting both the legacy of past investments and the ongoing transition towards more modern, higher-performing cable systems.

PILC

What is a medium voltage transition cable splice?

A medium voltage transition cable splice is a specialised splice used to connect different cable generations or insulation systems within one MV network. The most common application is the transition from PILC cables to XLPE cables during phased network upgrades. These splices connect insulation systems with fundamentally different electrical and ageing behaviour. If not correctly selected or installed, transition points can become a major source of failures and unplanned outages.

Transition cable splices are therefore not ordinary accessories They form critical interfaces within ageing networks and are exposed to concentrated electrical, mechanical and environmental stresses. Experience across MV networks shows that failures occur disproportionately at these transition points. When a transition fails, the consequences are immediate and costly: unplanned outages, complex fault location, repeat excavation and a measurable impact on SAIDI / SAIFI.

Joints for cable transition
Typical functions of transition cable splices
  • Electrical continuity between legacy and modern cable sections
  • Protection of conductors and insulation at the transition interface
  • Sealing against moisture ingress and environmental influences
  • Keeping PILC cables from drying out and ageing
  • Long‑term reliability in mixed medium voltage network

The role of transition cable splices in medium voltage networks

Unlike a standard straight‑through splice, a transition cable splice must accommodate fundamental differences between the connected cable systems, including:

  • Different insulation materials
  • Different dielectric behaviour
  • Different ageing mechanisms
  • Different sensitivity to moisture ingress
Because of this complexity, transition cable joints are among the most critical applications in MV networks that are upgraded or extended in phases. For Distribution Network Operators (DNOs), these splices are not related to new‑build projects, but to ensuring that old and new infrastructure can operate together reliably over long periods.

Typical applications of transition cable splices in MV networks

Transition cable splices are commonly applied in the following scenarios. Across all these scenarios, the same reality applies: if a transition cable splice fails, repair is rarely simple. This is why a reliability‑first approach to transition cable splices is essential for effective MV network governance.

windmolenpark
  • Phased cable replacement
    Sections of ageing cable are replaced due to condition or end of life, while adjacent sections remain in service. Transition cable splices enable continued operation across old‑to‑new interfaces.
  • Network reinforcement and capacity upgrades
    New MV sections are introduced to accommodate increased load or changing network requirements. Cable generations and technical standards can differ along the same route.
  • Urban and industrial cable routes
    In congested environments, access limitations significantly increase the cost and impact of rework. Reducing failures at transition points becomes disproportionately important for network reliability.

Current situation: a mixed network under pressure

European electricity networks are currently in a transitional phase. Across many countries, distribution systems consist of a hybrid mix of ageing PILC cables and newer XLPE cable systems. While PILC was the standard for decades, XLPE has become the preferred technology for new installations and network upgrades.

At the same time, this mixed asset base introduces growing challenges. A large share of the installed infrastructure is approaching or exceeding its technical lifespan. Older PILC cables, in particular, can remain in service for 40 to 70 years or more, and are increasingly at risk of degradation and failure as they reach end-of-life (EA Technology – ageing cables).

This situation is further intensified by the energy transition. Increasing electrification and the integration of renewable energy sources place additional stress on existing networks. As a result, utilities are accelerating replacement and modernisation programmes. In this context, XLPE has become the dominant choice due to its improved performance, easier installation and long-term reliability compared to older technologies (Crown – Why utilities and industry should consider mv xlpe cables over pilc cables).

Ultimately, the coexistence of legacy PILC systems and modern XLPE infrastructure creates a growing need for reliable transition solutions. Ensuring continuity, safety, and performance in these mixed networks is becoming a key priority for utilities across Europe.

Cables transition joints

Key trends affecting transition connections

  • Hybrid networks combining legacy PILC and modern XLPE systems
  • Ageing cable infrastructure approaching end-of-life
  • Increasing risk of failures in older cable assets
  • Growing network load due to electrification and renewables

PILC to XLPE transitions and why failures develop over time

Paper‑insulated cables and XLPE cables are based on fundamentally different insulation principles. PILC cables rely on impregnated paper insulation and a metallic sheath, where long‑term performance depends on maintaining insulation condition and preventing drying out. XLPE cables use solid polymer insulation, which behaves differently under electrical stress and is more sensitive to moisture ingress.

A transition cable splice must bridge these two systems within one assembly. At this interface, differences in electrical behaviour, ageing characteristics and mechanical properties must be carefully managed. Key challenges include controlling the electric field, preventing moisture migration, ensuring stable mechanical protection and maintaining continuous earth and screen connections.

Because of these interface‑related challenges, transition cable splice failures are often delayed rather than immediate. Degradation typically develops gradually due to moisture ingress at material interfaces, slow moisture migration along insulation boundaries and local electrical stress that can lead to partial discharge activity. These processes often remain hidden for years.

As transition cable splices are usually buried and inaccessible after installation, degradation can continue unnoticed until breakdown occurs. This is why, for Distribution Network Operators (DNOs), long‑term stability must be ensured at the moment of installation. Transition points are therefore frequently the weakest link in an otherwise reliable medium‑voltage cable route.

Failure transitions joints

Typical transition cable splice failure mechanism

Transition cable splice failures are rarely caused by one single mistake. They develop through a chain of mechanisms that starts at the interface and evolves over time.

Step 1 — Interface mismatch

At a transition point, different insulation systems meet within one splice. Paper‑insulated and polymer‑insulated cables have different electrical properties, ageing behaviour and mechanical stiffness.
If this interface is not optimally controlled, local electrical stress concentrations can develop. These stresses are often stable at first, but they form the starting point for long‑term degradation.

Step 2 — Moisture ingress

Small imperfections at the interface, combined with environmental exposure, can allow moisture ingress over time.
Moisture typically migrates slowly along material boundaries inside the splice. Because this process is gradual and hidden, it often remains undetected during commissioning and early operation.

Step 3 — Partial discharge and progressive ageing

When moisture and electrical stress combine, partial discharge activity can initiate at the interface. This leads to progressive insulation ageing, gradually reducing dielectric strength. Eventually, this process results in breakdown and failure, often long after the original installation.

Failed MV cable joint

Why installation quality is critical for transition cable splices

Transition cable joints bring multiple risk factors together at a single point in the MV network. These risks are not only related to splice design, but are strongly influenced by installation quality and site conditions. At transition points, small deviations during installation can have a disproportionate impact on long‑term reliability.

Installation‑related risks typically fall into three categories:
Installation transition joint

Technical risks

  • Incompatibility between cable generations
  • Insufficient stress control
  • Voids or incomplete encapsulation

Operational risks

  • Challenging working conditions
  • Variation in installation quality
  • Limited inspection after installation

Lifecycle risks

  • Repeat excavation and reinstatement
  • Increasing outage impact over time
  • Transition points dominating reliability performance

Common installation‑related failures and mistakes

Even where certified cable splice systems, such as cold‑shrink or heat‑shrink solutions, are used, failures often result from avoidable installation errors. In transition cable splices, these errors are amplified by mixed cable constructions and varying field conditions.

Common causes include incorrect joint selection for the cable combination, insufficient preparation of paper insulation, contamination at interfaces, incomplete filling and inconsistent execution due to unclear procedures or limited transition‑specific training. Preventing these failures depends less on adding steps and more on standardised procedures, repeatable installation and focused training.

What reliable transition cable splices require and how to select them

Reliable transition cable splices must do more than provide an initial electrical connection. They must remain stable over time while connecting cable systems with different electrical, mechanical and ageing behaviour. For DNOs, reliability at transition points depends on both the intrinsic characteristics of the joint and the way the solution is selected for the specific network context.

Key reliability requirements

Reliable transition cable splices are characterised by:
  • Stable insulation behaviour across different cable types
  • Long‑term resistance to moisture ingress
  • Robust mechanical protection and continuous screen and earth bonding
  • A clear, repeatable cable splice procedure that limits installation variability
These requirements distinguish a splice that works at commissioning from a transition that remains reliable throughout its service life.

Selecting transition cable splices for MV networks

Different technologies are used in cable splices, including resin‑based solutions and other certified systems. For transition applications, selection should be driven by the reality of the network, not by generic product categories. Mixed cable generations, long service life expectations and constrained access conditions all influence the suitability of a transition solution.
A practical way to structure selection is to ask:
“Which choice reduces the probability of failures at this transition point?”
Keeping this question central helps maintain focus on reliability, outage reduction and long‑term performance—the outcomes that matter most to DNOs.

Common technologies used for transition cable splices

Different technologies are used to realise transition cable splices in medium voltage networks. Each technology has specific characteristics that influence its suitability for connecting legacy and modern cable systems. Understanding these differences helps DNOs make informed selection decisions.

Cable preparation transition joint

Resin cable splices

  • Suitable for underground and moisture‑prone environments
  • Provide robust mechanical protection and reliable sealing
  • Commonly applied in traditional and renewable energy grid connections

Cold‑shrink cable splices

  • Controlled and repeatable installation process
  • Consistent insulation quality independent of installer experience
  • Suitable for all medium‑voltage energy applications

Heat‑shrink cable splices

  • Widely used in traditional grid installations
  • Installation quality strongly depends on installer skill and process control

Silicon Insulated cable splices

  • Applicable where low partial discharge (PD) performance is required
  • Strong performance in environments with potential water ingress
  • Often selected for demanding applications

Lovink transition cable splices for medium voltage networks

Lovink’s LoviSil® medium voltage cable splices are designed as transition, straight through and branch splices, and the same technology is also applied in other MV splice types.

For transition splices, the relevant point is not the catalogue breadth, but how the design addresses the known transition risks: interface stability, sealing, moisture behaviour and installation repeatability.

Below are the key features that matter in transition contexts:

Electrical insulation: fluid silicone for stable interface behaviour

The principal dielectric is contained within an ABS inner shell and uses a high‑grade silicone‑based compound. This compound remains fluid, which helps minimise the risk of discharge mechanisms that can be associated with dried‑out paper insulation.

A relevant design element for transitions is the equivalent εr value: the dielectric constant of liquid silicone is practically identical to the insulation of polymeric cables (XLPE/EPR) and remains so even when cured. This supports a consistently homogeneous electric field — a practical benefit at mixed‑material interfaces.

Mechanical protection: robust housing with long‑term moisture resistance

Mechanical protection is provided by a strong ABS outer shell, filled with two‑component polyurethane resin. This resin provides long‑term moisture resistance, and a copper wire mesh serves as the electrical screen.

Earth and screen protection: encapsulation that supports corrosion resistance

The polyurethane resin provides environmental protection for the main earth bond and screen components. With its “searching” characteristics, it encapsulates every item, supporting corrosion resistance and durability of the bonding system.

Sealing: bonded shell + secondary protection mechanism

The bonding of polyurethane resin to ABS provides a guaranteed seal to the outer shell. If moisture would penetrate to the inner splice, a soft, water‑resistant and insulating rubber is formed around the cores when cured, providing an additional protective layer against the effects of moisture ingress.

Installation: intuitive, controlled and a clear step sequence

Installation is described as easy, intuitive and fast, with an installation process accomplished in 7 steps (cable preparation through outer splice filling).

  • Installation requires only standard installation tools and does not involve the use of a burner or open heat source.
  • The splice is supplied with pre‑assembled and pre‑positioned components wherever possible.
  • During filling, levels can be controlled effectively: the transparent inner splice and grey outer joint include level indicators, and the LoviSil® bag has handles and a filling spout.

This supports repeatability and reduces installation variance — a key contributor to long‑term joint performance.

Proven technology and testing relevant to underground conditions

LoviSil® MV joints have almost 40 years of proven field experience with an extremely low failure rate. They have been tested according to

  • HD 628 / EN IEC 61442 and HD 629, executed under water pressure of 2 bar, which is relevant for applications in waterlogged soils and high water tables.
  • IEEE 404
LoviSil M Transition Splice 12-24 kV

Related Solutions for transition connections

Extended splice

An extended transition splice provides additional space for bonding, screening or accommodating complex cable constructions. Lovink applies extended splice solutions where extra mechanical and electrical robustness is required to ensure long‑term reliability.
LoviSil M extended cable splice for industry

End splice

An end splice is applied where a cable route is terminated or temporarily taken out of operation, while maintaining insulation and environmental protection. Lovink supports end splice applications that ensure controlled termination in ageing MV networks.
LoviSil end joint for end of medium voltage route

Repair splice

A repair splice offers a practical solution to restore damaged medium voltage cable sections without full cable replacement. Lovink applies repair splice solutions that minimise excavation, reduce outage impact and support rapid network restoration.
LoviSil M repair sleeve medium voltage

Trusted by DNOs for Long-Term Network Renewal Programmes

For many Distribution Network Operators (DNOs), transition splices are not occasional components but a recurring part of long-term network renewal programmes.

Lovink supplies annual transition splice requirements to multiple DNOs across Europe, supporting the gradual replacement and modernization of ageing cable networks.

Several of these partnerships have been in place for decades. This long-term collaboration reflects the importance of reliability, consistency and lifecycle performance when managing transition points between legacy and modern cable systems.

Improving consistency in MV transition cable splice installation

Even the most advanced transition cable splice solutions depend on correct application to deliver reliable long‑term performance. In MV networks with mixed cable generations, installation conditions are often demanding and access after commissioning is limited, making training and technical support essential.

Lovink supports DNOs with structured training, clear installation guidance and practical on‑site support, helping to reduce installation risks and improve consistency across crews. Early validation of procedures under real network conditions further reduces commissioning risk and supports predictable long‑term reliability at transition points.

By integrating training and project‑specific validation early in execution, installation procedures can be verified under real network conditions.

Lovink Academy klaslokaal

Cable splice training & certification

  • Practical installation training for medium‑voltage cable splices
  • Focus on repeatability, consistency and error reduction
  • Training delivered in the field or in a classroom setting
  • Train‑the‑Trainer programs for larger project teams
  • Certification via the Lovink Academy

Technical support

  • Application guidance and full technical documentation
  • Support during installation and commissioning
  • Alignment with standards and project specifications

Project‑specific trials

  • Validation of splicing solutions in real project conditions
  • Support during pilot installations worldwide
  • Reduced risk before full deployment

Improving reliability with  MV transition cable splices

Transition cable splices are a practical necessity in ageing medium voltage networks. As legacy cable systems are gradually connected to modern XLPE cables, transition points become an integral part of network modernisation. At these interfaces, long‑term reliability is often decided.

Reliable performance of transition cable splices requires more than selecting the right components alone. It depends on correct application, validated performance, trained installation and practical support throughout the full lifecycle of the network asset. A structured approach helps reduce technical risk, avoid repeat interventions and protect long‑term reliability indicators such as SAIDI and SAIFI.
Lovink supports DNOs throughout this process — from early technical advice and solution selection to training, validation and practical support during installation. Get in touch to discuss your MV transition cable splice strategy and identify opportunities to improve your grid reliability.

Request technical advice 

Discuss your transition cable splice challenges with a specialist and explore how reliability at critical transition points can be improved in your MV network.

Plan training or certification

Ensure consistent installation quality through structured cable splice training and certification.

Validate your solution

Set up a trial or pilot installation to confirm performance before large‑scale deployment.

FAQ

Below you will find answers to frequently asked questions about transition cable splices in medium voltage networks. These questions reflect common concerns related to reliability, failure mechanisms and practical application in existing MV infrastructure.

1. What is a PILC to XLPE transition cable splice?

A PILC to XLPE transition cable splice is a medium voltage splice used to connect paper‑insulated lead‑covered (PILC) cables to modern XLPE cables within the same network. It is typically applied during phased cable replacement or network upgrades. The splice must bridge insulation systems with very different electrical and ageing behaviour, which makes correct selection and installation critical.

2. Why do transition cable splices fail?

Transition cable splices usually fail due to interface‑related issues rather than conductor problems. Common causes include moisture ingress, insufficient stress control and installation errors at the transition between different cable types. These effects often develop over time, which is why failures can occur years after installation.

3. How long do medium voltage transition cable splices last?

The service life of a medium voltage transition cable splice depends on splice design, installation quality and environmental conditions. When correctly selected and installed, transition cable splices are expected to perform reliably for several decades, often matching the remaining life of the connected cables. Installation quality and long‑term sealing are decisive factors.

4. What is the difference between straight through splices and transition cable splices?

A straight‑through splice connects similar cable types, with the same insulation system and construction. A transition cable splice connects different cable generations or insulation systems, such as PILC and XLPE. Transition splices are more complex because they must manage differences in electrical behaviour, ageing and moisture sensitivity within one splice.

5. Are transition cable splices the weakest point in medium voltage networks?

In ageing MV networks, transition cable splices are often among the most critical points, because they combine different materials and ageing mechanisms. While cables themselves can have long service lives, failures frequently originate at transition interfaces. This makes transition splices a key focus area for improving long‑term network reliability.

These FAQs cover the most common questions about transition cable splices. For additional insights and technical guidance, explore our complete FAQ library.