LoviSil® oil refill splice solution for transformer station replacement
When replacing several transformer stations, a large oil refinery chose the LoviSil® oil refill splice. This innovative solution not only ensures a reliable connection, but also maintains the oil supply in PILC cables.
Why choose oil refill splices?
New connection stations are often suitable for plastic cables. When the existing PILC network is still in good condition, replacement is costly and unnecessary. The contractor found the most sustainable solution in the LoviSil® oil refill splice, which:
- Prevents paper cables from drying out
- Offers perfect connection thanks to liquid insulation technology
- Combines ease of installation and cost savings
Importance of Cable Knowledge and Training
The project started with extensive theoretical and practical training. Because it was an unusual lead cable, the focus was on cable preparation.
“Our trainer carried out both the training and supervision and the assembly went to our complete satisfaction,” says John Lerant, Export Manager Lovink Enertech.
All-in-one cable splice for jointers
Jointers like to choose LoviSil® oil refill splices because of their ease of installation and durability. The oil refill splice offers everything in one:
- Reliable connection
- Cost savings
- Easy assembly
- Sustainable solution for existing grids
Want to know more? Contact us
Would you like to know more about LoviSil® oil refill splices for PILC cables and transformer station projects? Feel free to contact one of our specialists.


