Skip to content
Lovinkweg 3, 7061 DT Terborg
|
T
+31 (0)315 33 56 00
|
E
info.le@lovink.com
|
Home
Solutions
Utilities
Connections
All cable combinations
Polymeric cables
Branch connections
Crossbonding
Large cables
Feed-in sustainable energy
End cable trace
Solutions
Extension life span
Repair transition joints
Repair straight through joints
Industry
Connections
All cable combinations
Polymeric cables
Branch connections
Large cables
Feed-in sustainable energy
Solutions
Extension life span
Repair transition joints
Repair straight through joints
Sustainable energy
Connections
All cable combinations
Polymeric cables
Branch connections
Feed-in sustainable energy
News
Projects
Blogs
About us
Contact
Projects
Home
/
Projects
/
13-07-2021
LOVISIL® IN WINDFARM NORTH GERMANY
24-02-2021
LOVINK ENERTECH SUPPLIES CABLE JOINTS FOR THE LARGEST WIND FARM IN EUROPE
28-10-2020
LOVISIL® OFFERS SOLUTION FOR ENERGY SUPPLY TO GRAVEL PIT
05-10-2020
LOVISIL® LOOP JOINT IS GAINING GROUND IN THE NETHERLANDS
28-09-2020
LOVISIL INSULATION MEDIUM OFFERS SOLUTION FOR 400 LITRE TERMINAL BOX
16-06-2020
LOVISIL® BRANCH JOINTS OFFER USEFUL SOLUTION FOR MAINTAINING WIND FARMS
16-04-2020
LOVISIL® OFFERS RELIABLE JOINT FOR SOLAR FARMS
02-09-2019
LOVISIL® STRAIGHT JOINTS IN LARGE MINE PROJECT SOUTH AFRICA
15-07-2019
LOVISIL® SOLUTION AT CHEMICAL PLANT WITH CABLE BRIDGES
10-06-2019
LOVISIL® FOR SOLARFARM DOWN UNDER
20-05-2019
NO MORE FAILURES IN MADEIRA THANKS TO LOVISIL®
12-10-2018
LOVISIL® BRANCH JOINT FOR ROUTE WITH PARALLEL CABLES
20-06-2018
LOVISIL® OIL REFILL JOINT SOLUTION FOR REPLACING TRANSFORMER STATIONS
10-05-2018
LOVISIL® BRANCH JOINT OFFERS SOLUTION FOR NEW CHARGING STATION
12-03-2018
INSTALLATION LOVISIL® OIL REFILL JOINT: SIMPLE AND FAST
28-11-2017
LOVISIL® CROSS-BONDING JOINTS PROVIDE A RELIABLE NETWORK AT MINOR COSTS
28-11-2017
LOVISIL® BRANCH JOINT OFFERS CONNECTION IN ONE HOUSING
20-07-2017
SUCCESSFUL INTRODUCTION AND TRAINING ON LOVISIL® BRANCH JOINTS IN AUSTRALIA
04-03-2016
LOVISIL® LOOP JOINT ELIMINATES THE NEED FOR A CABLE LOOP
29-09-2015
LOVISIL® CABLE JOINTS MAKE THE PORT RELIABLE AND FREE OF FAILURES
31-10-2014
LOVISIL® FEED-IN JOINT IS THE MOST ECONOMIC CHOICE AT WIND PARKS
24-02-2015
LOVISIL® STRAIGHT THROUGH JOINTS FOR CAPE VERDE
11-06-2014
LOVISIL® TRANSITION JOINTS OFFER A RELIABLE SOLUTION IN HIGH WATER AREA VENICE
25-02-2014
LOVISIL® CABLE JOINTS SOLUTION IN SMALL PIT AREA
28-10-2013
LOVISIL® OIL REFILL JOINTS OFFER SOLUTION WHEN SWITCHGEARS ARE REPLACED
15-05-2013
LOVISIL® EXTENDED CABLE JOINTS FOR LARGER CABLES
25-10-2012
LOVISIL® TRANSITION JOINTS SOLUTION FOR NEW SUB-STATIONS
10-10-2012
LOVISIL® CROSS-BONDING JOINT OFFERS SOLUTION FOR CABLE LOSSES